Syncrolift Pool-Israel Shipyards
Name of the Project-Syncrolift Pool-Israel Shipyards
Client:Anton Brothers LTD
Location: Israel Ship yards port Yulies Simon St 53, Haifa.
Description of the project:Building a Syncrolift pool for maintenance of incoming ships
.Scope of work:
Diaphragm wall thickness 80cm and 60 cm total of 9,000 m3 meter depth about 30m
Bentonite piles 100cm diameter total length of 1,000 m.
.